Coverage Register

Construction

Cover follows the contract: the works, the plant, the design liability and the bonds the principal demands. Annual policies and project-specific ones need reconciling.

Lines this class usually carries

7 lines

A schedule in this class that does not show one of these raises the finding "usually held in construction, not on this schedule". Absence is a question, not a fault: the cover may sit inside another policy or have been declined on purpose.

Lines it often needs and often lacks

7 lines

Raises the finding "often needed in construction and often lacking, not on this schedule". Worth a written answer either way, so a retained exposure is a recorded decision.

Check your schedule against this class

Paste the schedule with a first line industry: construction, or pick the class from the list, and the register names the lines from these two tables that the schedule does not show, beside the arithmetic on every line it does. Six lines free, no account.

Build my coverage register